Posted in Construction on August 27, 2007 | Leave a Comment »
For the past several weeks we have had the front stairs closed so they could build the stairs to the 3rd floor.
They built a wall around the staircase to prevent anyone from using the stairs while the work was being done. The elevator has been getting a good workout due to the closure. Our drive-thru [...]
Read Full Post »
Posted in Construction on August 12, 2007 | Leave a Comment »
The building process continues. The bank is now taking shape with the yellow board on the outside and the work on the 2nd floor and roof. They have closed off the front stairs so they can add the stairway to the 2nd floor. The elevator is the only option right now for customers to get [...]
Read Full Post »