Feeds:
Posts
Comments

Archive for September, 2007

Third level stairs

Angie and Marge decided they would don their construction hats and check out the new construction area.  They hadn’t been up the new stairs to the second level and they were excited to see what was happening.

 
Next they decided to check out the new drive-thru machines.  Our drive-thru has been closed since the middle part [...]

Read Full Post »

Telephone

We recently replaced our telephone system at the bank and now we need to find a home for our old telephones.

We also  called in an out of town consultant just to make sure everything was being done correctly.

The vapor barrier was sprayed on, which changed the yellow to a green.

Read Full Post »

Outside view

The construction is progressing quite well and the shape of the bank is now in place.  The construction noise inside the bank is beginning to sound normal – well almost normal.  It is so interesting to be able to watch our project every step of the way.

 
 

The drive-thru is still closed, but the ATM can [...]

Read Full Post »